1. Lifting points for the assembled trolley + the crane
2. Consider the pillar as a anchoring point (the one opposite the cryo we want to maintain)
3. Alternative: to use the threaded rods of the nearest pillar as anchoring point alternative to the ones on the floor.
4. Reduce of the weight (where possible) of the crane design
5. Draft assembly procedure of the crane.
6. Rigging to be involved in the design and the FEA to be provided.
7. Investigation of the surroundings of the cryo module to be checked.
8. Verification of the design to QA and rigging.