Description
- Detectors (20 mins)
- Commissioning expectation: Who is doing what, detector group and Hereon team?
- Order of gas mixture
- ECDC (20 mins)
- Integration plan
- Instrument control
- MCA (20 mins)
- Testing of the components which are ready for installation (slits, hexapod, ...)
- Coordination of component installation, cable pulling, cable testing, component
- Pre-installations/Testing areas (MCA, monitors, ECDC)
- Chopper cascade testing stand
- Test area for Hexapod and Robot; ECDC integration plan?
- Necessary prerequisites for Testing, i.e. energisation, Q-gate, necessary people, etc.
- Complex integration of multiple stakeholders
- Definition of the partial SAT testing out of the bunker
testing, ... - Exchangeable devices (Hexapod <-> Robot), What can be done in the cave without installation in place?
- Beam Monitors
- Status of the project
- Integrated testing out of the bunker with the chopper cascade assembly
The timetable has not been filled yet.