Session

Installation + Integration

15 May 2025, 13:30
Lisa Meitner (ESS)

Lisa Meitner

ESS

Description

  • Detectors (20 mins)
    • Commissioning expectation: Who is doing what, detector group and Hereon team?
    • Order of gas mixture
  • ECDC (20 mins)
    • Integration plan
    • Instrument control
  • MCA (20 mins)
    • Testing of the components which are ready for installation (slits, hexapod, ...)
    • Coordination of component installation, cable pulling, cable testing, component
  • Pre-installations/Testing areas (MCA, monitors, ECDC)
    • Chopper cascade testing stand
    • Test area for Hexapod and Robot; ECDC integration plan?
    • Necessary prerequisites for Testing, i.e. energisation, Q-gate, necessary people, etc.
    • Complex integration of multiple stakeholders
    • Definition of the partial SAT testing out of the bunker
      testing, ...
    • Exchangeable devices (Hexapod <-> Robot), What can be done in the cave without installation in place?
  • Beam Monitors
    • Status of the project
    • Integrated testing out of the bunker with the chopper cascade assembly