BIFROST System Acceptance Review Meeting
Tycho-Brahe
Please be invited to the BIFROST System Acceptance Review Meeting.
BIFROST Site Tour will be offered on the 2nd September at 09:00-12:00. Invitation will be sent separately to the Reviewers, the Instrument Team and NSS Technology Leads.
Overview of BIFROST SAR Documentation
You can find attached the detailed invitation list that contains their role in the review process.
The charge for the SAR is:
- Validate that all system components, as defined by the Instrument FBS, are presented and installed. This ensures that all project scopes have been delivered.
- Validate that all system documentation has been delivered and is in CHESS.
- Validate that all technical documentation has been delivered, stored in CHESS, and is appropriately linked to the FBS structure.
- Review the integrated cold commissioning report and ensure that it represents a sufficient test of the instrument systems, showing that all requirements that are testable during cold commissioning have been addressed.
- Confirmed that the performed testing has verified performance against the requirements that are testable during the cold commissining.
- Review the operating processes of the instrument and Hot Commissining plan.
- Review the list of non-conformities and their actual or proposed resolution and determine if they are appropriate.
- Prepare a review report.
The required participants to join in person:
• Review Committee members,
• Presenter(s) of the Instrument Team,
• Remainder(s) of the Instrument Team,
• Presenting Technology Group Members.
Optional in person:
• Official Observers,
• Tranche1 Instrument Teams,
• Instrument In-Kind Management.
Due to the capacity of the room, we provide the meeting on Zoom for:
• NSS Community,
• relevant Science Instrument Divisions.
Join Zoom Meeting
https://ess-eu.zoom.us/j/69315485153?pwd=09U8qyD3NdFtUCISK1NftCBcjvnWaz.1&from=addon
Meeting ID: 693 1548 5153
Passcode: 890320