Conveners
Instrument Class Meeting - Spectroscopy
- Pascale Deen (European Spallation Source ERIC)
Description
An overview of various issues (Liam and Rasmus BIFROST):
Assembly in E02, requirements by ESS to train external staff (technicians, electricians, craning)
Interface between ESS and Instrument (e.g. installation of Air condition system within control cabin).
Shielding
Results of tenders for Tank, Hutch and divergence jaws
Detector electronics
Optics: D03/E02/E01: (Fernando CSPEC).
Guide vacuum housing. Optics FAT/SAT. Requirement of support staff during installation.
Any further topics from MIRACLES/VESPA/TREX teams:
Mario (TREX): TG3 (Detector vessel) experience
Perhaps VESPA found a solution to suppress elastic line intensities?
How is MIRACLES coming along with tank deflections and cave roof access?
The timetable has not been filled yet.