Second DMSC Detector Group Readout Workshop

Europe/Stockholm
COBIS M10 (A+B) (DMSC)

COBIS M10 (A+B)

DMSC

Description
This workshop is focussed on the specification and development of the generic ESS readout system. Specifics of any particular or individual readout front ends or designs such as VMM, SoNDe etc will be the subject of future meetings. Discussion should be focussed on achieving convergence on the main topics in the programme, in particular on creating a realistic work plan for the coming six months.
    • 09:30 10:20
      Welcome and Introduction COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

      • 09:30
        Welcome from DMSC 15m
        Speaker: Tobias Richter (European Spallation Source ERIC)
      • 09:45
        Welcome from DG 15m
        Speaker: Richard Hall-Wilton (European Spallation Source ERIC)
      • 10:00
        Success and Lessons Learned from V20 20m
        Speakers: Jonas Nilsson (European Spallation Source ERIC), Steven Alcock (European Spallation Source ERIC)
        Slides
    • 10:20 11:00
      Interface Definition: Discussion and comments on draft document provided by SK COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

      • 10:20
        Status Quo and Questions 20m
        Speaker: Morten Jagd Christensen (European Spallation Source ERIC)
        0
        Slides
      • 10:40
        Update from DG 20m
        Speaker: Dr Scott Kolya (European Spallation Source ERIC)
        Slides
    • 11:00 11:20
      Coffee 20m COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

    • 11:20 12:20
      Interface Definition: Discussions - Procedures, Details of Technical Issues, Time lines COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

    • 12:20 13:30
      Lunch 1h 10m COBIS M6

      COBIS M6

      DMSC

    • 13:30 14:00
      Accelerator information and timing for Instrument specific front ends COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

      short presentations, discussion on options provided by the generic readout framework and configuration

    • 14:00 14:45
      What happens next: testing plans and hardware development and support COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

      • 14:00
        Hardware of Packet Data Generator 20m
        Speaker: Steven Alcock (European Spallation Source ERIC)
        Slides
    • 14:45 15:15
      Slow control and calibration COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

      generic options, ideas for different frontend specific integrations models, storing of calibration

    • 15:15 15:35
      Coffee 20m COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

    • 15:35 16:20
      BrightnESS Fast Sample Environment COBIS M10 (A+B)

      COBIS M10 (A+B)

      DMSC

      • 15:35
        BrightnESS requirements 20m
        what is needed for deliverables detailed hardware and support requirements discussion and agreed plan
        Speaker: Jonas Nilsson (European Spallation Source ERIC)
        Slides