SANS STAP Meeting / LoKI Progress
Wednesday 17 Sept 2014, 09:00
→
17:30
Europe/Stockholm
Scheele (ESS HQ)
Scheele
ESS HQ
document
Chopper Simulations - Frame Overlap
Detector Strategy for LoKI
Line of Sight and Benders
LoKI_PBS_Draft_10.1cil.pdf
NOSG - Beam/Optics Standards
NOSG - Shielding Standards
System_Requirement_Document_13.6.3_LoKI.pdf
Slides
1
Introduction and SANS Status Update
Speaker
:
Andrew Jackson
(
European Spallation Source ESS AB
)
2
Status report on SESANS
Speaker
:
Dr
Wim Bouwman
(
TUD/RID
)
3
Discussion
4
Status report on VSANS/GISANS
Speaker
:
Sylvain Desert
(
LLB
)
5
Discussion
10:45
Coffee
6
Presentation of OPUS Add-on Proposal
Speaker
:
Andrew Jackson
(
European Spallation Source ESS AB
)
Slides
7
Discussion
8
STAP Feedback to Work Units
12:00
Lunch
9
Status of Shielding Calculations
Speaker
:
Nataliia Cherkashyna
(
ESS
)
Slides
10
Role of the STAP during construction and Tollgate 2 Review
Speaker
:
Ken Andersen
(
European Spallation Source ESS AB
)
Slides
11
LoKI Overview and Progress
Speaker
:
Andrew Jackson
(
European Spallation Source ESS AB
)
Slides
12
LoKI Engineering Design
Speaker
:
Clara Lopez
Slides
14:45
Coffee
13
LoKI Detectors
Speaker
:
Kalliopi Kanaki
(
European Spallaton Source ESS AB
)
Slides
14
STAP Discussion and Report Drafting
15
STAP Feedback to LoKI Team