V3 mobile crane discussion

Europe/Stockholm

Crane presented to Xavier R. and Henry P.

The comments were:

Henry: 

1. The design should modified and become more flexible in terms of mounting to the pedestals. 

2. The horizontal upper beam should change due to conflict with a pipe which can't be removed.*

3. The gate valve mounting should change with the laboratory version one. Implementation to the design will be done by Kostas.

 

Henry asked about the delivery time. The answer wasn't obvious because there are always changes to be implemented to the design which leads in delays and changes to the official drawings.

*This information arrived today even it was known since the beginning. This has an impact to the design and procuremtn time.