13–17 May 2019
Scandic Star Hotel
Europe/Stockholm timezone
INTERNATIONAL TECHNICAL SAFETY FORUM 2019

Session

Risk Assessment

16 May 2019, 13:00
Scandic Star Hotel

Scandic Star Hotel

https://www.scandichotels.se/hotell/sverige/lund/scandic-star-lund

Conveners

Risk Assessment

  • Enrico Cennini (ESHAC Committee)

Presentation materials

There are no materials yet.

  1. Mrs Marmol Moreno Carme (ALBA)
    16/05/2019, 13:00
    Risk assessment

    Health & Safety Group, ALBA Synchrotron facility, Cerdanyola del Vallès, Spain
    ALBA is the Spanish synchrotron facility formed with a 3GeV electron synchrotron accelerator generating bright beams of synchrotron radiation, located in Cerdanyola del Vallès (near Barcelona city).
    The electrons are accelerated in a 100 MeV linear accelerator (LINAC). Then, the electron beam enters in a synchrotron...

    Go to contribution page
  2. Mr Brian Sherin (SLAC National Accelerator Laboratory)
    16/05/2019, 13:20
    Risk assessment

    The US Department of Energy (USDOE) National Labs are typically structured with an Executive Management team consisting of a Lab Director, Deputy Director for Science and a Deputy Director for Operations. The latter serves as the Laboratory’s Chief Operations Officer (COO), overseeing the mission support operations that help enable the science mission of the laboratory. A major responsibility...

    Go to contribution page
  3. CHRISTELLE GAIGNANT (CERN)
    16/05/2019, 13:40
    Risk assessment

    The High Luminosity LHC (HL-LHC) is an upgrade of the LHC to achieve instantaneous luminosities a factor of five larger than the LHC nominal value, thereby enabling the experiments to enlarge their data sample by one order of magnitude compared with the LHC baseline programme.

    The HL-LHC project deliverables rank from standard industrial equipment to innovative unprecedented technologies,...

    Go to contribution page
  4. Mr Bill Rainey (Jefferson Lab)
    16/05/2019, 14:00
    Safety culture and behavior

    Several negative experiences at Jefferson Lab uncovered a programmatic weakness in the way we tasked contractors providing various services. A process is being put in place to correct this deficiency.

    Go to contribution page
Building timetable...