CDR-2 and CDR-3 for Quadrupole and Dipole Power Converters
→
Europe/Stockholm
Elettra
Elettra
-
-
1
Welcome and IntroductionSpeaker: John G Weisend II (European Spallation Source ERIC)
-
2
Executive session – Review Committee onlySpeaker: John G Weisend II (European Spallation Source ERIC)
-
3
Introduction of participants and their roles
-
4
Communication schemeSpeaker: Roberto Visintini (Elettra Sincrotrone Trieste)
-
5
Description of NGPS System vs. Technical SpecificationsSpeaker: Energy Technology – CAEN
-
6
Interface ports
Interface ports:
- AC power input (CNPW);
- DC power output (Magnets);
- Interlock inputs (Magnet thermo-switch & flow switch) and outputs
- Ethernet for remote controlSpeaker: Energy Technology – CAEN -
7
Safety aspects
Safety aspects:
- AC line breakers;
- Enclosure IP index;
- Protection of terminals against direct contacts;
- Over temperature and short circuit protection;
- Other internal interlocksSpeaker: Energy Technology – CAEN -
10:20
Coffee break
-
8
Description of system configuration
Description of system configuration for:
- PCQ5, PCQ6 and PCQ7;
- PCQ8;
- PCD1;Speaker: Energy Technology – CAEN -
9
Time ScheduleSpeaker: Roberto Visintini (Elettra Sincrotrone Trieste)
-
10
Testing plan in factory (FAT)Speaker: Energy Technology – CAEN
-
11
QA/QC plans;Speaker: Energy Technology – CAEN
-
12
Executive session – Review Committee only
-
13
Close-out – All participants
-
1