ESS Bilbao
Author in the following contributions
- Development of the DUMP-OT for MYRRHA phase I accelerator
- Progress in the Construction of ESS Bilbao accelerator as the First Phase of the ARGITU Project
- ESS Proton Beam Window (PBW): From Manufacturing to Site Commissioning
- Design and manufacturing preparation of a spectrometer vacuum vessel for the Second Target Station (STS)
- Structural Integrity, Manufacturability and pressure testing of STUMM-PROTO