IKON11 - The Eleventh In-Kind Contributions Meeting for Neutron Science for ESS
ESS Headquarters and Medicon Village
The IKON meetings are a regular forum centered around the design and construction of the ESS neutron instruments and their associated support facilities.
By bringing together current and future partners, the meetings aim to provide an overview on the various activities and fertilise exchange that is vital to our success.
Scientists from ESS member countries currently not engaged in in-kind activities but interested in joining are encouraged to participate.
IKON11 will be a collaboration meeting for building the ESS Neutron Scattering Systems.
The meeting will start on the Wednesday morning with plenary sessions in the Medicon Village Auditorium. The rest of the day will be dedicated entirely to parallel sessions centered around topics like Shielding, Beam extraction, Choppers and Halls & Infrastructure.
More details will be given shortly.
The parallel sessions will continue on Thursday until the early afternoon when we will take a bus to visit the ESS construction site. Those waiting for their turn to take the tour will have the opportunity mingle by the booths.
IKON11 will officially end after the plenary and feedback session Friday morning before lunch.
IKON11 Organizing Committee: Danielle Adonis, Giuseppe Aprigliano, Michela Dell’Anno Boulton, Pascale Deen, Richard Hall-Wilton, Zsuzsa Helyes, Arno Hiess, Shane Kennedy, Oliver Kirstein, Beate Linnenberg, Andreas Schreyer, Jon Taylor
-
-
10:15
Coffee break Medicon Village
Medicon Village
-
12:00
Lunch Inspira, Medicon Village
Inspira, Medicon Village
-
Latest updates on the Bunker Project Auditorium (Medicon Village)
Auditorium
Medicon Village
-
1
RequirementsSpeaker: Zvonko Lazic (European Spallation Source ERIC)
-
2
Neutronics calculationsSpeaker: Dr Valentina Santoro (European Spallation Source ERIC)
-
3
Latest Engineering DesignSpeaker: Zvonko Lazic (European Spallation Source ERIC)
-
4
Interfaces (beam through, utilities feed through, handling of 'colliding pillars'Speaker: Zvonko Lazic (European Spallation Source ERIC)
-
5
Q&ASpeaker: Zvonko Lazic (European Spallation Source ERIC)
-
1
-
Choppers Preparatory Session (Closed) Stora Tuna (ESS Headquarters)
Stora Tuna
ESS Headquarters
Individual estimates, positioning, function & maintainability
-
Halls and Infrastructure Preparatory Sessions (Closed) Linneasalen (ESS Headquarters)
Linneasalen
ESS Headquarters
Instrument cabins, technical rooms, cranes, engineering realities
-
15:00
Coffee break and move to ESS Headquarters
-
Choppers and Motion Control: Group 4: ESTIA, SKADI, FREIA, LoKI Stora Tuna (ESS Headquarters)
Stora Tuna
ESS Headquarters
Individual estimates, positioning, function & maintainability
- 6
- 7
- 8
-
9
Choppers Update (Design and Documentation)Speaker: Erik Nilsson (European Spallation Source ERIC)
- 10
-
11
Choppers Costing ExerciseSpeaker: Dr Sebastian Jaksch (FZ-Jülich Outstation at MLZ)
-
Halls and Infrastructure: Group 3: VESPA, DREAM, ODIN Linneasalen (ESS Headquarters)
Linneasalen
ESS Headquarters
Instrument cabins, technical rooms, cranes, engineering realities
-
12
Halls and Infrastructure- INSTRUMENT INTEGRATION INTO THE EXPERIMENTAL HALLS including instrument caves, cabins, pathways, cranes and other lifting logistics, storage areas (maintenance), labs and prep areas (vs. central labs and workshops). - OPPORTUNITIES AND BOUNDARY CONDITIONS FOR INFRASTRUCTURE INSTALLATION including supplies (from galleries to instrument), zoning, hazard analysis / general safety, CF requirements.
-
12
-
Shielding: Group 1: BIFROST, C-SPEC, T-REX, MIRACLES Christinehof (ESS Headquarters)
Christinehof
ESS Headquarters
-
13
Bifrost
-
14
T-Rex
-
15
CSPEC
-
16
Miracles
-
13
-
Beam Extraction: Group 2: BEER, HEIMDAL, NMX, MAGIC Tänkartanken (ESS Headquarters)
Tänkartanken
ESS Headquarters
-
17
Introduction from Neutron Scattering SystemsSpeaker: Dr Damian Martin Rodriguez (European Spallation Source ERIC)
-
18
Current design of the Neutron Beam Extraction SystemSpeaker: Bengt Jönsson (Areva)
-
19
Free discussion: Drawings and CAD 3D models will be used to support discussions
-
17
-
17:30
Reception Ljusgården (ESS Headquarters)
Ljusgården
ESS Headquarters
Tunavägen 24Mingle with drinks and finger foods
-
-
Beam Extraction: Group 1: BIFROST, C-SPEC, T-REX, MIRACLES Tänkartanken (ESS Headquarters)
Tänkartanken
ESS Headquarters
-
20
Introduction from Neutron Scattering SystemsSpeaker: Dr Damian Martin Rodriguez (European Spallation Source ERIC)
-
21
Current design of the Neutron Beam Extraction SystemSpeaker: Bengt Jönsson (Areva)
-
22
Free discussion: Drawings and CAD 3D models will be used to support discussions
-
20
-
Choppers and Motion Control: Group 3: VESPA, DREAM, ODIN Stora Tuna (ESS Headquarters)
Stora Tuna
ESS Headquarters
Individual estimates, positioning, function & maintainability
- 23
-
24
MCA Update (Review process)Speaker: Federico Rojas (European Spallation Source ERIC)
- 25
-
26
Choppers Update (Design and Documentation)Speaker: Dariusz Zielinski (European Spallation Source ERIC)
-
27
Choppers (Review process)Speaker: Markus Olsson (European Spallation Source ERIC)
- 28
-
Halls and Infrastructure: Group 4: ESTIA, SKADI, FREIA, LoKI Linneasalen (ESS Headquarters)
Linneasalen
ESS Headquarters
Instrument cabins, technical rooms, cranes, engineering realities
-
29
Halls and Infrastructures- INSTRUMENT INTEGRATION INTO THE EXPERIMENTAL HALLS including instrument caves, cabins, pathways, cranes and other lifting logistics, storage areas (maintenance), labs and prep areas (vs. central labs and workshops). - OPPORTUNITIES AND BOUNDARY CONDITIONS FOR INFRASTRUCTURE INSTALLATION including supplies (from galleries to instrument), zoning, hazard analysis / general safety, CF requirements.
-
29
-
Shielding: Group 2: BEER, HEIMDAL, NMX, MAGIC Christinehof (ESS Headquarters)
Christinehof
ESS Headquarters
-
30
Magic
-
31
Beer
-
32
Heimdal
-
33
NMX
-
30
-
10:30
Coffee break ESS Headquarters
ESS Headquarters
-
Beam Extraction: Group 4: ESTIA, SKADI, FREIA, LoKI Tänkartanken (ESS Headquarters)
Tänkartanken
ESS Headquarters
-
34
Introduction from Neutron Scattering SystemsSpeaker: Dr Damian Martin Rodriguez (European Spallation Source ERIC)
-
35
Current design of the Neutron Beam Extraction SystemSpeaker: Bengt Jönsson (Areva)
-
36
Free discussion: Drawings and CAD 3D models will be used to support discussions
-
34
-
Choppers and Motion Control: Group 2: BEER, HEIMDAL, NMX, MAGIC Stora Tuna (ESS Headquarters)
Stora Tuna
ESS Headquarters
Individual estimates, positioning, function & maintainability
- 37
-
38
MCA Update (Review process)Speaker: Federico Rojas (European Spallation Source ERIC)
-
39
MCA Costing exercise - NMXSpeaker: Giuseppe Aprigliano (European Spallation Source ERIC)
-
40
Choppers Update (Design and Documentation)Speaker: Erik Nilsson (European Spallation Source ERIC)
-
41
Choppers (Review process)Speaker: Dr Nikolaos Tsapatsaris (European Spallation Source ERIC)
-
42
Choppers Costing Exercise - HEIMDALSpeaker: Dr Paul Henry (ESS AB)
-
Halls and Infrastructure: Group 1: BIFROST, C-SPEC, T-REX, MIRACLES Linneasalen (ESS Headquarters)
Linneasalen
ESS Headquarters
Instrument cabins, technical rooms, cranes, engineering realities
-
43
Halls and Infrastructure- INSTRUMENT INTEGRATION INTO THE EXPERIMENTAL HALLS including instrument caves, cabins, pathways, cranes and other lifting logistics, storage areas (maintenance), labs and prep areas (vs. central labs and workshops). - OPPORTUNITIES AND BOUNDARY CONDITIONS FOR INFRASTRUCTURE INSTALLATION including supplies (from galleries to instrument), zoning, hazard analysis / general safety, CF requirements.
-
43
-
Shielding: Group 3: VESPA, DREAM, ODIN Christinehof (ESS Headquarters)
Christinehof
ESS Headquarters
-
44
Dream
-
45
ODIN
-
46
VESPA
-
44
-
12:30
Lunch and group photo ESS Headquarters
ESS Headquarters
Tunavägen 24 -
Beam Extraction: Group 3: VESPA, DREAM, ODIN Tänkartanken (ESS Headquarters)
Tänkartanken
ESS Headquarters
-
47
Introduction from Neutron Scattering SystemsSpeaker: Dr Damian Martin Rodriguez (European Spallation Source ERIC)
-
48
Current design of the Neutron Beam Extraction SystemSpeaker: Bengt Jönsson (Areva)
-
49
Free discussion: Drawings and CAD 3D models will be used to support discussions
-
47
-
Choppers and Motion Control: Group 1: BIFROST, C-SPEC, T-REX, MIRACLES Stora Tuna (ESS Headquarters)
Stora Tuna
ESS Headquarters
- 50
-
51
MCA Update (Review process)Speaker: Federico Rojas (European Spallation Source ERIC)
- 52
-
53
Choppers Update (Design and Documentation)Speaker: Dariusz Zielinski (European Spallation Source ERIC)
-
54
Choppers (Review process)Speaker: Markus Olsson (European Spallation Source ERIC)
-
55
Choppers Costing ExerciseSpeaker: Dr Rasmus Toft-Petersen (Technical University of Denmark)
-
Halls and Infrastructure: Group 2: BEER, HEIMDAL, NMX, MAGIC Linneasalen (ESS Headquarters)
Linneasalen
ESS Headquarters
Instrument cabins, technical rooms, cranes, engineering realities
-
56
Halls and Infrastructure- INSTRUMENT INTEGRATION INTO THE EXPERIMENTAL HALLS including instrument caves, cabins, pathways, cranes and other lifting logistics, storage areas (maintenance), labs and prep areas (vs. central labs and workshops). - OPPORTUNITIES AND BOUNDARY CONDITIONS FOR INFRASTRUCTURE INSTALLATION including supplies (from galleries to instrument), zoning, hazard analysis / general safety, CF requirements.
-
56
-
Shielding: Group 4: ESTIA, SKADI, FREIA, LoKI Christinehof (ESS Headquarters)
Christinehof
ESS Headquarters
-
57
ESTIA
-
58
SKADI
-
59
LOKI
-
60
FREIA
-
57
-
Booths group 2 Ljusgården (ESS Headquarters)
Ljusgården
ESS Headquarters
Planners, Motion Control and Automation, Detectors, DMSC
-
Site visit Expedition 1 ESS site
ESS site
-
Booths group 1 Ljusgården (ESS Headquarters)
Ljusgården
ESS Headquarters
Planners, Motion Control and Automation, Detectors, DMSC
-
Site visit Expedition 2 ESS Site
ESS Site
-
IKON Dinner Restaurant Edison
Restaurant Edison
-
-
-
Feedback from Parallel Sessions and end of meeting Medicon Village
Medicon Village
-