Speaker
Dr
Elena Donegani
(European Spallation Source ERIC)
Description
The commissioning of the high-power proton accelerator of the European Spallation Source (ESS) started in 2018 and it is ongoing in Lund (Sweden). During the multiple commissioning phases, a variety of beam destinations have been primarily used to safely absorb and dissipate the high-power proton beam.
This presentation will summarize the measurements and contributions to the commissioning of the ESS accelerator by means of the beam destinations that include: Faraday cups for [0.075, 75] MeV protons, insertable beam stops for [70, 250] MeV protons and a tuning beam dump for [800, 2000] MeV protons.
Author
Dr
Elena Donegani
(European Spallation Source ERIC)