CEA In kind contribution to the ESS Accelerator
→
Europe/Stockholm
Conf room Axet (ESS head quarters)
Conf room Axet
ESS head quarters
Tunavägen 24, Lund
-
-
08:45
→
09:00
Introduction 15m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, LundSpeakers: David McGinnis (European Spallation Source), Mats Lindroos -
09:00
→
09:30
Status of the French-Swedish Cooperation Agreement (Projects 1 to 7) 30m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, LundThe presentations shall summarize the 8 projects using the following content: 1/ What has been achieved till now: Scope/Cost/Schedule 2/ What remains to be done: Scope/Cost/Schedule 3/ Tracking progress and possible mitigation: Scope/Cost/ScheduleSpeakers: Antoine Dael (CEA), Christine Darve (European Spallation Source), Pierre Bosland (CEA)-
Project 1: Injector reliability Test 15mSpeaker: Aurelien Ponton (European Spallation Source)
-
Project 2: 352 MHz power coupler bunker 15mSpeakers: Pierre Bosland (CEA), Steve Molloy (European Spallation Source)
-
Project 3: Eight equipped and tested superconducting cavities 15mSpeakers: Pierre Bosland (CEA), Steve Molloy (European Spallation Source)
-
Project 4: Contribution to the TDR 15mSpeakers: Christine Darve (European Spallation Source), Pierre Bosland (CEA)
-
Project 5: Engineering design effort 15mSpeakers: Christine Darve (European Spallation Source), Pierre Bosland (CEA)
-
Project 6: Design, construction and test of a complete spoke cryomodule 15mSpeakers: Pierre Bosland (CEA), Steve Molloy (European Spallation Source)
-
Project 7: New infrastructure for superconducting cavity hydrogen outgazing 15mSpeakers: Pierre Bosland (CEA), Steve Molloy (European Spallation Source)
-
-
09:30
→
10:00
Project 8: Elliptical Cavity Cryomodule Technology Demonstrator 30m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, LundSpeaker: Christine Darve (European Spallation Source)-
General requirements for the ECCTD 15mSpeaker: Christine Darve (European Spallation Source)
-
CEA status 15mPresentation should include: * CEA organization and Project management * RF status * Cryo status * ICS plateformSpeakers: Garry Trahern (European Spallation Source), Pierre Bosland (CEA)
-
- 10:00 → 10:20
-
10:20
→
10:40
Coffee break 20m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, Lund -
10:40
→
12:00
Identify possible issues for the ESS construction 1h 20m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, Lund* Spoke linac * Medium beta linac * High beta linacSpeakers: Christine Darve (European Spallation Source), Dr Stephen Molloy (ESS)-
Cavity production 15mSpeaker: Steve Molloy (European Spallation Source)
-
Cryomodule production 15mSpeaker: Christine Darve (European Spallation Source)
-
-
12:00
→
13:30
LUNCH All together 1h 30m Medicon Village Restaurant
Medicon Village Restaurant
-
13:30
→
15:00
Planning the French in-kind contribution 1h 30m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, LundConstruction phase (design update, fabrication, assembly and test): -High beta -Medium beta -(Spoke) -RFQSpeakers: Antoine Dael (CEA), Aurelien Ponton (European Spallation Source), Christine Darve (European Spallation Source), David McGinnis (European Spallation Source), Florence Ardellier (CEA), Mats Lindroos (European Spallation Source) -
15:00
→
15:20
Conclusion and Action Items 20m Conf room Axet
Conf room Axet
ESS head quarters
Tunavägen 24, LundSpeakers: Christine Darve (European Spallation Source), Mats Lindroos (European Spallation Source)
-
08:45
→