Preliminary Design Review PDR Waste building H09
Monday 5 Feb 2018, 08:30
→
16:45
Europe/Stockholm
Paracelsus 203-1 (ESS)
Paracelsus 203-1
ESS
Tunavägen 24, Lund
Peter Jacobsson
(
European Spallation Source ERIC
)
1. PDR Agenda 5 Feb 2018
Acoustic Design Report
Architectural layout
Basis for the load plan
Basis of Structural Design
Common Systems ICD
Drains and thresholds
ELECTRICAL DUCTING GROUND
ELECTRICAL DUCTING PLAN
ES&H system requirements on H09 Waste Building
Fire Safety Strategy Report
HVAC Connections to Earthwork systems
HVAC Cooling water Flow chart Baseline
HVAC Domestic Water Flow chart Baseline
HVAC Drawing binder Plan drawings PD
HVAC Flow chart controlled Ventilation
HVAC Flow chart Sprinkler
HVAC Flow chart Ventilation
HVAC Heating Flow chart
HVAC Radiological Waste Water Flow chart
HVAC Waste Water Flow chart Baseline
Process PFD process part 1
Process PFD process part 2
Process system requirement list
Radioactive Waste Transport Container ATB12K
System Description Electrical
System description H09 Waste building
System Description HVAC
System Description Process
System description Structure
System Description Transport
System Requirements Electrical
System Requirements H09 Structure
System Requirements HVAC
Technical Baseline Structural
08:30
→
09:00
Welcoming and presentation of charge suggestion: Peter Jacobsson / Per Persson
Peter Jacobsson/Per Persson
0.a Charge suggestion
0.b Reviewed PDR documents
09:00
→
09:20
Introduction to Swedish Waste management system and its application in ESS: Per Persson
Presentation 1 (2) by Per Persson
09:20
→
09:40
Coffee break
09:40
→
10:10
Waste management in the Waste building H09: Per Persson
Presentation 2 (2) by Per Persson
10:10
→
10:30
Presentation of the project: Boris Kildetoft, Project Manager
Presentation by Boris Kildetoft
10:30
→
10:50
Presentation of Architectural and Structural design: Frank Kezerle
Presentation by Frank Kezerle
10:50
→
11:10
Presentation of Fire Protection: Frank Kezerle
11:10
→
11:30
Time for questions
11:30
→
12:30
Lunch: Inspira, Medicon Village
12:30
→
12:50
Presentation of Process design: Kenneth Lindström
Presentation by Martin Hansson
12:50
→
13:20
Presentation of HVAC design: Patrik Persson
HVAC presentation
13:20
→
13:40
Presentation of Electrical design and Access control: Ralph Ahlcrona
Presentation by Ralph Ahlcrona
13:40
→
14:30
Time for questions
14:30
→
14:45
Coffee break: incl. 3D Virtual Reality model of project available -Lukas Nowikowski
14:45
→
16:45
Review committee meeting: Review committee