The ESS Bunker Critical Design Review

Europe/Stockholm
Activation study
Air Activation within Bunker
Bunker Activation Report
Bunker CDR documents summary
Bunker EBoM
Bunker top assembly
Bunker transfer zones
CDR agenda
Committee charge
Committee report
Comparison of neutronics model of the bunker
Contribution of NSS areas
Detailed structural analysis report
document
Dose assesment in the offices
Dose budget alocation
Drop load calculation
Frame calculation reports
Frame drawings
Frame installation plan
Labeling and installation_Frame
Neutron dose rate contribution from the roof
Neutronics calcs for the Bunker Feed through
Neutronics considerations on dilatation joints
Neutronics of the bunker roof and wall
Roof analyses reports
Roof blocks labeling
Roof Drawings
Sizmic analysis D02
Slides
System documentation
Wall drawings
Wall feedthrough drawings